I have produced my lesson planning database and am starting to add some functionality to it. Thanks again for the amazing calendar interface.
I have about a dozen courses, each with a course ID. I have from 3 to 50 lessons for each course. The number of lessons in total is non negotiable.
Each lesson appears in place of an appointment ( i used the existing appointments, just changed most of the fields).
My challenge.
Having prepared all of the activities and stuff for each lesson, I find that for eg. at lesson 10 things go pear shaped and i need to insert a lesson or two. Therefore need to shift all lessons up and knock one or two off the end. Sometimes I will have some revision "slack lessons" at th eend which I could rob from the scheme.
I am wondering whether I should use and array to copy all records in the scheme for the course and then move them up, or whether i should simply run through the records in the table copying each one as i go and replacing it with the previous record right there in the table.
I would be interested to know whether anyone has any advce on this one. It is possible that someone will say that there is a way to do this built into FM but I can't see it.
Any advice please....much apreciated.
Thanks
Brian
Move records up by one appoinment - an array?
1 post
• Page 1 of 1
Posts: 14
Joined: Mon Jul 02, 2007 2:48 pm |
|
1 post
• Page 1 of 1
Who is online
Users browsing this forum: No registered users and 2 guests