Hi,
I am in the process of testing importing our existing projects database into the seedcode projects.
I am using the same logic as importing contacts and i have gotten as far as importing the main project details and contacts... but i am having a problem importing the start and end dates.
I have assigned a 'seedcodeprojectid' into our old projects and created data table layout showing records of 'ProjectApptOverview'...
I have imported new records into this table with the ApptProjectID_kf importing as the 'seedcodeprojectid'
the records import ok into the table, but the dates don't show up on the projects layout.
Am I missing a step in their somewhere?
I think i need to assign the ApptType_kf also.... what do I assign this to?
Best Regards,
*k
Importing Projects Dates
2 posts
• Page 1 of 1
Posts: 22
Joined: Tue Feb 27, 2007 6:18 am Location: London, UK |
|
Posts: 22
Joined: Tue Feb 27, 2007 6:18 am Location: London, UK |
ok, nevermind, i figured out i needed to set apptprojectoverview to '1'