Version History
What is the latest build of SeedCode Complete.
The build number for your copy of SeedCode Calendar can be found at the top left of the home screen or in the field CalendarInterface::BuildNumberCalc.
The latest build of the new FM11 version of Complete is 3.11 (September 5, 2011). This a paid upgrade: a major new build introducing a number of new features.
Unlike previous builds, 3.11 is now licensed per-user. Because of this, and the number of code changes, you won't be able to move this code into your build and will need to import your data into the new version if you'd like to upgrade.
New features include:
Optional QuickBooks integration
Optional Zulu ready: links to iCal, Google Calendar, and Google Contents
Scripts for migrating data to new version
Improved developers' documentation
Builds 2.3 - 3.0 (Sept 2010 - August 2011). A few private builds delivered to developers using Complete as a framework for their new projects. These had various versions of the 3.11 features in place.
Build 2.2 (August 9, 2010). This made a number of changes to further accommodate International Date Formats. If you're running with US date formats you likely don't need to change any of this, though you may be interested in some of the other changes below.
Contact us to get the new 2.2 build; note that Complete is a separated system so you can replace the SeedCodeComplete file (the one we've changed) without loosing your data (though values lists you've edited will need to be updated). If you'd like to make these changes in your copy, because you've modified the SeedCodeComplete file, please get a new build from us anyway, so you can copy script steps and calcs below.
Build 2.1 (July 27, 2010) was our first public build.
Build B1.1 (July 18, 2010) was our last beta release and is based on the Pro Calendar engine build '5.55.
Older versions have build numbers through 1.36 and those can be found here.